Risk registers and heat maps

By the end of this module you can build a risk register, rank risks by expected loss, test each fix by its net benefit, read a heat map without being fooled by it, and decide what a board needs to see.

Part 1. The lecture

One list, scored one way

By now Alderwick has four legal matters, each with its own chance and cost. A risk register puts them in one table, scored the same way, so that the biggest can be seen first and nothing is forgotten. It is the working tool of every compliance team, and it is often what a board actually asks to see.

A useful register row has:

  • a name that says what could happen;
  • a chance and an impact (from Modules 2 and 3);
  • an owner, one named person;
  • a fix, what it costs, and what it does to the chance (or the impact);
  • the residual risk that remains after the fix.

Ranking by expected loss

Multiply chance by impact to get the expected loss of each risk, and sort the list. It tells you where, on average, the money is at risk. It does not tell you which risk comes first, or which would hurt most if it did happen, and a rare, severe risk can have a small expected loss but still deserve a separate look: could the client survive it?

Is the fix worth it?

Every fix costs something. Its net benefit is the expected loss it removes minus what it costs:

net benefit = (chance before − chance after) × impact − cost of the fix

Moving Alderwick’s payments to letters of credit cuts that risk from 30 to 10 per cent on a $50,000 impact, which removes $10,000 of expected loss for a $12,000 cost: a net loss of $2,000, so on averages alone it is not worth doing. It might still be worth doing if the client cannot bear the bad outcome, which is a different test. State which test you are applying.

Heat maps: useful and dangerous

A heat map puts each risk in a grid, with chance across and impact up. Red is high on both. It is quick to read, so it is popular in board papers. It also hides things:

  • Two risks in the same cell can differ by a factor of three in cost.
  • A risk just under a band edge looks safer than one just over it.
  • The colours imply a ranking that the underlying figures may not support.

The rule: never show the map without the numbers beside it, as the lab does.

What a board needs to see

  • The few largest risks, not all of them, with the figures.
  • The proposed fixes, their cost, and what remains afterwards.
  • What the board is asked to decide.
  • The register itself, in an appendix, kept up to date. Chances and impacts change as facts and fixes change.

Common mistakes

  • Scoring risks on a 1 to 5 scale with no figures behind the scores.
  • No owner, so nobody is responsible for the fix.
  • Treating a fix as free, or as removing the risk entirely.
  • Forgetting that a fix may create a new risk.
  • Writing the register once and never updating it.

Part 2. Lab: Register Builder

Alderwick’s four matters are already in the register. Change the figures, add a risk of your own, and see which fixes are worth their cost. When you are happy, download it as a spreadsheet or print it.

A register lists every risk in one place, scored the same way, so the biggest can be seen first. Edit the figures, add your own risks, and watch the ranking, the heat map and the value of each fix change.

RiskChance %Impact if it happensFixFix costChance % after fix

The ranked register

#RiskExpected lossResidual after fixFix costNet benefit of the fix
1Contract dispute with the buyer$35,000$20,000$5,000+$10,000 worth doing
2Regulatory inquiry$20,000$8,000$25,000−$13,000 costs more than it saves
3Stalled cross-border payment$15,000$5,000$12,000−$2,000 costs more than it saves
4Employee claim$14,000$8,750$8,000−$2,750 costs more than it saves
Total$84,000$41,750$50,000−$7,750

Expected loss is the chance times the impact. Net benefit is the reduction in expected loss from the fix, less what the fix costs. Both are averages, so a rare, severe risk can matter more than its expected loss suggests.

The heat map

Chance of happening, across. Impact if it does, up. Numbers match the ranking above.

Warning: a heat map hides magnitude. Two risks in the same cell can differ by a factor of three in cost, and a risk just under a band edge looks safer than one just over it. Always show the figures next to the map, as above.

Part 3. Check your understanding

Ten questions drawn from a larger pool. In this pilot your score is shown but not saved.

Loading quiz…

This course teaches a method with invented figures and fictional parties. It does not give legal advice, and its numbers are for practice. Never paste a real client’s confidential details into any public tool.